Saturday, May 30, 2015

Greenhouse Construction

Legs for media beds

Vermicompost moved out of the greenhouse, 6 yes

Loosened up clay sub soil

Get a good look at that tank

Excavation 4"x8"8 one foot deep

lots of moving dirt

 Old tank with liner and front wall removed

60mil HDPE pond liner, super tough stuff but brutal to work with because of its stiffness

Old tank bowed out in all directions, half of the screw were sheared or broken when disassembled


Fish in temporary holding tanks  with heaters air stones and plants

ground leveled and tamped

tank in the ground 

Flush with tank

A layer of sand added for smoothness

Dura-skirm liner in place

All folded up and stapled 

Pump

Pump disassembled, easy

No comments:

Post a Comment